gerco.gr - Main Component
2023 PAPI calculations for Kerkyra Airport
Study for the Installation of a mobile PAPI System at Kerkyra Airport, Phase ll.
2022 HELIDREAM Heliport
Design and licencing of a public use Heliport in Athens.
2022 Medium Intensity Obstruction Lights for TERNA S.A
Supply of Medium Intensity Onstruction Lights for Installation on Wind Turbunes.
2022 Supply and Installation of a Portable Airfield Lighting System at Kerkyra Airport
Supply and Installation including PAPI calculations of Radio controlled Solar Powered Runway Lights and a PAPI System at Kerkyra Airport.
2022 Major Retractable Gear Components for Hellenic Air Force
Multiple contracts for the supply to Hellenic Air Force of major components for Retractable Gear Arresting Systems.
2022 Arresting Nets for Hellenic Air Force
Multiple contracts for the supply to Hellenic Air Force of MEN SL-24 Arresting Nets.
2022 Parnassos Ski Center Heliport
MEP building , including Fire Fighting and Medium Obstruction Lights on the surrounding hills.
2022 Tilos Island Municipal Heliport
Overhaul and replacement of complete MEP installation and equipment of Tilos Island Municipal Heliport.
2021 Arresting Nets
Supply to Hellenic Air Force of MEN SL-24 arresting nets.
2021-2022 Design and Construction of a roof top Heliport
Design and Construction of a roof top Heliport at Onassis Foundation Transplant Hospital Athens.
2019-2021 Skorpios Island Heliport Base
2021 Andros Island Municipal Heliport
2021 Parnassos Ski Center Heliport
Complete design including aeronautical studies, architectural and MEP of a heliport base in Parnassos.